Design Standards & Specifications

Guidance, standards, and tools for planning, permitting, and constructing utility infrastructure.

At CCUA, we believe that high-quality utility service starts with high-quality design. This page is your technical library, containing the essential manuals, standard details, and specifications required to construct water, wastewater, and reclaimed water facilities within our service area.

Development Applications & Forms

Development Services New Application

This application should be completed for projects requesting:
• New water, wastewater, or reclaimed water service installations
• Residential or commercial development projects
• Utility infrastructure extensions or modifications
• New construction requiring CCUA utility services

The application provides CCUA with project details, requested utility services, property information, and contact information for the owner, developer, engineer, and authorized project representatives.

Download Application for Service
Development Applications & Forms

Design Standards & Details

We’re here to help you design and construct utility infrastructure that meets CCUA requirements and provides reliable service to our community for years to come. Our standards, specifications, and technical resources are intended to make the development process clear, consistent, and easy to follow.

CCUA’s Standards & Details provide the technical, material, and construction requirements for water, wastewater, and reclaimed water infrastructure that will be dedicated to CCUA. Standard detail sheets are available for download and should be incorporated into project construction plans where applicable.

Utilizing CCUA’s standards and details helps streamline the review process, improve construction consistency, reduce revisions during plan review, and support the long-term reliability of the utility system.

Download Standard Details Sheets
Design Standards & Details

Approved Materials Manual

To support a reliable and long-lasting utility system, CCUA maintains a list of approved materials, manufacturers, and products for use throughout our water, wastewater, and reclaimed water infrastructure systems.

Using approved materials helps ensure system compatibility, consistency in construction, and a smoother plan review, permitting, and inspection process. The Approved Materials Manual also provides contractors, engineers, developers, and suppliers with clear guidance on materials accepted for use within the CCUA utility system.

Launch Approved Materials Manual
Approved Materials Manual

Permitting & Review Timeframes

We understand that time is critical to the success of a development project. CCUA’s Development Services Department is committed to providing timely and thorough reviews to help keep projects moving forward efficiently.

Review Process: Upon submission, project plans and supporting documents enter the CCUA review process to verify compliance with applicable CCUA standards, specifications, policies, and utility requirements.

Resubmittals: If revisions or additional information are required, review comments and red-line markups will be provided to the applicant. Resubmitting complete and clearly addressed revisions will help streamline the review process and reduce delays in permit issuance and project approval.

Download Permits & Forms
Permitting & Review Timeframes

Plan Review Process

  1. Submit construction plans, calculations, permits, and required supporting documents to CCUA Development Services for review.
  2. CCUA staff will review the submittal for compliance with applicable CCUA standards, specifications, policies, and utility requirements.
  3. If revisions or additional information are required, review comments and red-line markups will be returned to the applicant.
  4. Revised plans and responses to comments must be resubmitted for continued review and approval.
  5. Once plans are approved and all applicable agreements, fees, and permits are completed, construction may begin.
  6. During construction, inspections and required testing must be completed in accordance with CCUA requirements.
  7. Final signed and sealed as-built drawings and closeout documentation must be submitted and approved prior to final acceptance of the utility infrastructure.

Incomplete or inaccurate submittals may result in review delays.

Use the arrows to navigate the table.

Submittal Type Description Typical Review Time
Initial Plan Review First submittal for Clay County Utility Authority (CCUA) review Up to 29 business days
Subsequent Plan Review Revised plans following initial review comments Up to 20 business days
Resubmittals After Approval Revisions requiring plan re-review after approval Up to 20 business days
Revision Plan Review (RFI) Minor deviations from approved plans submitted with an RFI and revision clouds 5 business days
Preliminary As-Built Review Initial as-built drawing submittal 10 business days
Resubmittal As-Built Review Revisions as-builts submitted for acceptance 5 business days

As-Built Review Specifications & Templates

To support accurate record documentation and efficient project closeout, CCUA provides As-Built Review Specifications, requirements, and standardized templates for utility construction projects. Submitting complete and accurate as-built documentation helps ensure timely review, system acceptance, GIS integration, and final project closeout. Utilizing CCUA’s standardized templates and requirements also helps streamline the review process and reduce resubmittals.

Launch As-Built Resources
As-Built Review Specifications & Templates